Saturday, March 21, 2026

Finally, working outdoors

 The last couple of days have been good so Jill has been working outdoors. The rockery has had more added to it. The path now reaches the step and the new drainage ditch is getting bigger . The cat helped!









We had a quick break yesterday, and got lucky. We had a lazy hare for about 20 minutes.




The tide was right out at Melby which meant the Long tailed ducks were feeding right on the shoreline.











Jill checked on the  wildlife camera. Need to check the footage properly but it looks like we captured something good. While down the bottom Jill checked on the new bridge ( Jilly's bridge) down by the loch. It is now much easier getting to the beach. Thank you Liam from Access Shetland. https://www.shetland.gov.uk/blog/shetlandoutdoors It's appeared in less than two weeks of asking. 



The beach was great today. Some good waves to watch.









Did spot a distant otter



No comments:

Post a Comment

Finally, working outdoors

 The last couple of days have been good so Jill has been working outdoors. The rockery has had more added to it. The path now reaches the st...