Getting ready to batten down the hatches as the wind is due to blow a bit tomorrow.
Today we had a delivery of the flooring for the new upstairs room. It's a big pile but we managed to get it all in through Bruce's, soon to be patented, window opening.
The chaps also added lots more dwangs to attach the flooring too.
Some of the flooring can go down tomorrow.
Jill worked on tidying up the green room, caulking, touching up the paintwork and filling the coving joins. When it's dry it can be sanded and repainted.
Geri had he door left open today so she can explore a bit. She didn't go far but it is a start.
No comments:
Post a Comment