Wednesday, August 10, 2022

Hopefully, sorted

 We hoped  Rob would be out by lunchtime but it took a bit longer to get his potassium levels down. It appears it was caused by  tablets. It will take a few days to clear from his system, but he should be right as rain soon.

Michael and Patrick carried on in the house with Jill only getting a bit done before heading to the hospital. 

 The wall under the boarding around the flue is really gross and we are toying with getting a company in with the right stuff to clean it




The new joists upstairs look sound



As promised picture of the first attempt at repairing a wall outside. There were 3 big holes and 2 small round ones. 2 to go.